2010 · Historical account
Power supply under dispatcher supervision
In 2010, I.V.A. continued work on the car park’s engineering systems, developing power-supply supervision and telemetry access for the second commissioning phase.
When a facility is commissioned in stages, its control software changes with it. Equipment is added, the set of signals expands and the operator needs visibility of more areas. In spring 2010, the car park project acquired two connected extensions.
The first concerned power supply. A dedicated monitoring and supervision workstation was developed, from technical design and user interface to installation and commissioning on site. Equipment status was to become accessible to the dispatcher.
The second extended the existing engineering-systems workstation. It added access to controllers in the second phase, including telemetry acquisition and display. Software development followed the expansion of the facility.
Power-supply work was accepted in stages: one acceptance certificate was signed on 14 December 2010, another on 18 May 2011. The event recorded in 2010 therefore continues into the following year, following delivery rather than the calendar boundary.